A plumbing permit must be obtained by a licensed contractor, City of Carroll or equal, and all work must be completed by a licensed contractor. When is an Electrical Permit required?
• New Construction. An electrical permit is required to install any electrical conductor or equipment subject to the provisions of the 2003 International Electrical Code. An electrical permit can be obtained by calling City Hall at 712-792-1000 and talking with a Building Official. • Existing Structures. An electrical permit is required to install, alter, reconstruct or repair any electrical conductor or equipment subject to the provisions of the 2003 International Electrical Code, provided that the electrical work exceeds five hundred dollars ($500.00) in value. An electrical permit can be obtained by calling City Hall at 712-792-1000 and talking with a Building Official. ** An electrical permit must be obtained by a licensed contractor, City of Carroll or equal, and all work must be completed by a licensed contractor. Do I need a permit for work in an emergency situation? In an emergency situation, work may be initiated without first submitting a permit application and receiving a pe
Related Questions
- A plumbing permit must be obtained by a licensed contractor, City of Carroll or equal, and all work must be completed by a licensed contractor. When is an Electrical Permit required?
- When is a mechanical permit and licensed contractor required?
- When is a plumbing permit and licensed contractor required?