After a road has been reclaimed, how long before the road can be paved?
Asphalt Emulsion and Liquid Calcium Chloride stabilized bases require a curing period. The length of time necessary for proper curing will vary depending upon weather and environmental conditions, but generally takes 3 to 5 days. If all conditions are right, Foamed Asphalt stabilized bases can be paved as early as the following day.