|
Mohawk Engineered & Longstrip (glueless) Hardwood Floors can be installed over most concrete slabs (not solid hardwood). The concrete slab must be fully cured for at least 60 days, free of structural defects, clean and visually dry with no history of moisture problems. When testing for moisture, Mohawk suggests utilizing the industry-standard calcium chloride test or the Tramex Moisture Encounter (5 max). Note: All 3/8" solid products may be glued to a concrete slab using Mohawk's approved glue and sealant system. Light-weight concrete that has a dry density of 100 pounds or less per cubic foot is not suitable for Mohawk hardwood floors.
|
Can I install Mohawk Hardwood Flooring over a concrete slab?
Related Questions
- Mohawk Engineered Hardwood Floors may be installed on all grade levels. See the Installation Guidelines for ...
- Yes, Mohawk Engineered & Longstrip (glueless) Hardwood Floors are suitable for installing over a radiant ...
- Mohawk Engineered & Longstrip (glueless) Hardwood Floors can be installed over most concrete slabs (except ...
- Mohawk Laminate Floors can be installed of many types of existing floors, such as ceramic tile, vinyl, and ...
- Unopened bottles of Mohawk's Instant Adhesive should be stored in a cool dry place. Many customers keep their ...