Important Notice: Our web hosting provider recently started charging us for additional visits, which was unexpected. In response, we're seeking donations. Depending on the situation, we may explore different monetization options for our Community and Expert Contributors. It's crucial to provide more returns for their expertise and offer more Expert Validated Answers or AI Validated Answers. Learn more about our hosting issue here.

Do I Have Flexibility in Preparing the Stormwater Pollution Prevention Plan (SWPPP) and Selecting Best Management Practices (BMPs) For My Site?

0
Posted

Do I Have Flexibility in Preparing the Stormwater Pollution Prevention Plan (SWPPP) and Selecting Best Management Practices (BMPs) For My Site?

0

Stormwater pollution prevention plan requirements were designed to allow maximum flexibility to develop the needed stormwater controls based on the specifics of the site. Some of the factors you might consider include: more stringent local development requirements and/or building codes; precipitation patterns for the area at the time the project will be underway; soil types; slopes; layout of structures for the site; sensitivity of nearby water bodies; safety concerns of the stormwater controls (e.g., potential hazards of water in stormwater retention ponds to the safety of children; the potential of drawing birds to retention ponds and the hazards they pose to aircraft); and coordination with other site operators. The approach and BMPs used for controlling pollutants in stormwater discharges from small construction sites may vary from those used for large sites since their characteristics can differ in many ways. Operators of small sites may have more limited access to qualified desig

What is your question?

*Sadly, we had to bring back ads too. Hopefully more targeted.