Questions
Articles
Videos
Ask
Experts
Polls
Login
Sign Up
Health
Parenting
Cooking
Travel
Pets
Q:
Does the AZ DOT currently require retainage in traditional construction and or Design Build contracts?
2
Like
Unlike
Answer
Comment
Flag
Widget
Tags:
construction
require
design
build
contracts
dot
az
traditional
currently
retainage
Related Questions
Should sales tax be included in the calculation of retainage for a public works project?
- No. RCW 60.28.011 provides that there shall be reserved by the public body a percentage from the "moneys ...
Why don’t lenders require retainage on all construction loans?
- Commercial impracticality-it creates an administrative burden and usually, the borrower and contractor desire ...
When should a general contractor withhold retainage and how much should be withheld?
- A. A general contractor should only withhold retainage (2% up to 4% of the total contract amount) when a ...
How is retainage handled in JOB COST?
- Retainage is handled in the ACCOUNTS RECEIVABLE and ITEM BILLING modules.
What is the difference between a Contractor Bid Letter and a Contractor Release of Retainage?
- A. Government entities can only accept bids for Public Works Contracts from bidders who have an Employment ...
Is this page helpful to you?
Your
anonymous
feedback will help us improve.
Helpful
Not helpful
Thanks for your feedback!
A:
1 Answer
rank
1
1
Like
Unlike
Comment
Flag
Edit
No - The prime can hold retainage against the sub but ADOT doesn't hold retention any more.
more
azdot.gov
/highways/.../FAQ.asp
Related Videos
Add your answer...
Top Related Experts
1.
sharon mandala
AZ
expert
·
Articles
·
0 Likes
2.
Asif Javeed
Design
expert
·
Articles
·
0 Likes
3.
john athan
Construction
expert
·
Articles
·
0 Likes
4.
Kevin Kleinschmidt
Construction
expert
·
Articles
·
0 Likes
5.
Monica Choo
Design
expert
·
Articles
·
0 Likes
Apply to be an expert »
Top Answerers
1.
Cheap SSL Certificates
7
Answers
in the past week
2.
vanity fair
7
Answers
in the past week
3.
Robert Turner
4
Answers
in the past week
More Top Answerers »
Top Askers
1.
Frank Bell
2
Questions
in the past week
2.
Frank Bigaglow
3
Questions
in the past week
3.
Charles McAtee
2
Questions
in the past week
More Top Askers »
Top Supporters
1.
Tom Wagner
9 Likes given in the past week
2.
Susan Brunner
3 Likes given in the past week
3.
CableAnd OtherThings Too
2 Likes given in the past week
More Top Supporters »
Please flag with care:
Offensive or Abusive
Spam
Ambiguous
Garbage
Duplicate
Inaccurate or Outdated
Comment (optional):
Flag
Cancel
What's wrong with this link?
If there's a problem with the answer itself, please flag the answer instead.
This URL is broken
This is a duplicate
The answer is no longer found at this URL
This is not the original source for this answer (please enter the original URL below)
Comment or suggest a replacement URL:
Flag
Cancel
Suggest a new URL
Has this answer moved? You could help us by suggesting a new URL where this answer can be found.
If there's a problem with the answer itself, please flag the answer instead.
Suggest a replacement URL:
Ok
Cancel
Does the AZ DOT currently require retainage in traditional construction and or Design Build contracts?
Related Questions
- No. RCW 60.28.011 provides that there shall be reserved by the public body a percentage from the "moneys ...
- Commercial impracticality-it creates an administrative burden and usually, the borrower and contractor desire ...
- A. A general contractor should only withhold retainage (2% up to 4% of the total contract amount) when a ...
- Retainage is handled in the ACCOUNTS RECEIVABLE and ITEM BILLING modules.
- A. Government entities can only accept bids for Public Works Contracts from bidders who have an Employment ...