Does the proposed plan require the level of the Causeway to be raised?
A. No. There are no plans to increase the height of the Causeway along its entire length. The road may be raised in some areas to accommodate the proposed culverts but the rise will be very gradual in either direction. Engineers designing the improvements will ensure property owners are not impacted (i.e. flooding of properties).