For Design/Pre-survey Locate requests, how long can the request be maintained as active, and does a new locate request need to be made prior to actual excavation?
Maintenance of the locate marks and the length of time they are good for is the same as described in question 11, a new locate request prior to excavation is required.
more
For Design/Pre-survey Locate requests, how long can the request be maintained as active, and does a new locate request need to be made prior to actual excavation?
Related Questions
- The presurvey conference seminar is a way of educating the administrator, the supervising nurse, and their ...
- Underground lines, both on and off your property, can be easily damaged by digging equipment. To ensure ...
- • In short, yes. Any cabling utilized up until the point where the signal reaches the CSEWI provided ...
- • The kind of sensors used are up to the teams. Cameras are acceptable as long as you still meet the ...
- Archeology excavations - whether real or pretend - often involve sand and small pieces of broken pottery or ...