For what length of time are approved Site Plans or Construction Drawings valid?
Currently, all approved Site Plans and Construction Plans are valid for as long as the bond is active. However, the Town’s current unwritten policy exceeds State Code allowances and could change at some date in the future. Town approvals for all other of plans and permits each have their own individual and differing time periods before expiration.