How are Soil and Sedimentation Erosion Control requirements to be incorporated in an Application for a Permit to Drill and Operate?

0
Posted

How are Soil and Sedimentation Erosion Control requirements to be incorporated in an Application for a Permit to Drill and Operate?

0

“Plans” under option 2 above must be on a prescribed form (Form No. EQP 7200-18) and submitted as part of the EIA. The “Plan” must cover all proposed earth changes at well pads, surface facilities, flow lines, and access roads.