If the FMEA is complete, you should have a total Risk Priority Number (RPN) for each failure mode identified. Each step in the process may have more than one failure mode, so total the RPNs from each failure mode to determine the RPN for each step. Start with the steps that have the highest RPN, as they pose the greatest risk. Within each step, start first on the failure modes that have the highest individual RPN.
more
|
How do I decide where to start making improvements after I complete a Failure Modes and Effects Analysis (FMEA)?
Related Questions
- The Process FMEA(PFMEA) is a point in time audit of the adequacy of the process in producing a product that ...
- Failure Mode and Effects Analysis (FMEA) is a logical, proactive technique that is used to identify and ...
- FMEA (Failure Mode and Effect Analysis) is not the primary tool for Risk Assessment. There are other tools as ...
- the exSILentia tool will enable you to determine a required SIL for a Safety Instrumented Function and ...
- A document that defines the new process or solution with requirements and includes potential causes and ...