How do tribes address) bridge construction on roads (flood control, funding; culverts, drainage systems under highways)?
To answer this question it would be best to contact the ADOT district engineer, or the respective BIA regional engineer and their staffs to discuss what the specific needs are and suggested alternative improvements. Specific drainage or bridge improvements must meet certain criteria, which can also be accessed through the district engineer, the BIA regional engineer and their staffs.
Related Questions
- FREQUENTLY ASKED QUESTIONS What does funding for Eastern Sandoval County Arroyo Flood Control Authority (ESCAFCA) pay for?
- How do tribes address) bridge construction on roads (flood control, funding; culverts, drainage systems under highways)?
- What is the Flood Control District doing to address the levees flood capacity?