Important Notice: Our web hosting provider recently started charging us for additional visits, which was unexpected. In response, we're seeking donations. Depending on the situation, we may explore different monetization options for our Community and Expert Contributors. It's crucial to provide more returns for their expertise and offer more Expert Validated Answers or AI Validated Answers. Learn more about our hosting issue here.

How do you achieve a 1- or 2-hour fire-rated ceiling in a duct protection, corridor, or stair suffit without incorporating a floor/ceiling design?

0
Posted seb345 edited answer

How do you achieve a 1- or 2-hour fire-rated ceiling in a duct protection, corridor, or stair suffit without incorporating a floor/ceiling design?

0
seb34510 seb345 edited answer

Perhaps you mean fire ventilation? In most cases, fire ventilation is installed in commercial buildings. This type of ventilation prevents the spread of fire and removes smoke from the room. I have seen such ventilation only a few times in residential buildings built several years ago. If you have something like this at home, you’re in luck. The most important thing is the constant care of such a structure. Problems often arise from dirt and dampness, which can create an undesirable odor. To avoid this, I always seek help at https://niftyductcleaning.com.au/. The specialists provide timely assistance, making me feel safe.

0

I-Stud Cavity Shaft Wall Systems can be erected horizontally and used as economical fire resistive assemblies for corridor ceilings, stair soffits and protection for mechanical ducts. Depending on the span of your ceiling, I-Stud and J-Track depth and gauge required will vary. The I-Stud Cavity Shaft Wall Systems for Horizontal Duct Protection consist of I-Studs 24″ o.c. with 1″ Fire-Shield Shaftliner panels inserted in the steel tabs, and three layers of 1/2″ Fire-Shield C wallboard attached to the stud flanges opposite the Shaft liner panels. This system provides fire protection for mechanical ducts and has been tested from both sides. (Refer to WHI-694-0300.1.) Single layer 5/8″ Fire-Shield or Fire-Shield C wallboard attached to the stud flanges opposite the 1″ Shaft liner panels provide one-hour fire protection when used as a corridor ceiling or stair suffix. Two layers of 1/2″ Fire-Shield C wallboard attached to the stud flanges opposite the 1″ Shaft liner provide two-hour fire pr

Related Questions

What is your question?

*Sadly, we had to bring back ads too. Hopefully more targeted.