How does the builder get a building permit ?
Design drawings should be prepared by an architect from which shop drawings are generated by the factory. These plans are then reviewed, approved and stamped by a third party engineering firm. Together with these plans, a foundation plan and any other drawings for conventionally built assemblies, your Builder should submit for Building Permit issuance.