Gravelpave2 is installed over a subbase of stone at a similar depth to what would be put under two inches of asphalt. Once the subbase is installed and compacted the Gravelpave2 is rolled out and nailed into place at the rate of four pins per square meter. Finally the product is back filled with a small, clean, and angular gravel a quarter inch above the rings and compacted into place. After compaction the fill stone should be flush with the top of the rings to prevent migration. 5) What size and type stone should I use as fill material. There are number of different fill suggestions made on the center page of the Gravelpave2 brochure. The important characteristics of the stone are that it is small (3/16"), washed, angular and hard. Small angular stone will lock together in the rings while large or rounded stone will migrate out of the rings into the surrounding area. The fill material must be a hard stone any soft stones, such as dolimite, will break down into a dirt/mud mixture and ...  more
invisiblestructures.com
4 more sources
Hide

Related Videos

Add your answer...

Top Answerers

1.
Cheap SSL Certificates
7 Answers in the past week
2.
vanity fair
7 Answers in the past week
3.
Robert Turner
4 Answers in the past week

Top Askers

1.
Frank Bigaglow
3 Questions in the past week
2.
Frank Bell
2 Questions in the past week
3.
Deitty smith
3 Questions in the past week

Top Supporters

1.
Tom Wagner
9 Likes given in the past week
2.
CableAnd OtherThings Too
2 Likes given in the past week
3.
Sh Bailbonds
2 Likes given in the past week
...