How is shielding installed?
The shielding materials and components (a shielding system) must be installed in accordance with the procedures that are particular to the facility being shielded, the degree of shielding effectiveness to be achieved, the special materials being employed, and the environmental conditions in which the system will be operating. In short, the installation should be performed by a competent and experienced shielding professional with the necessary tools and RF measuring equipment available to assure a thorough and long-lasting shield.