Most often the second floor joists are set on top of the first floor walls, the same as in conventional framing. In areas where additional support is needed, or where there are no first floor walls, the floor may be hung from the dome shell by anchoring a 5/8" threaded rod vertically into the concrete of a seam. One rod can hold 3,000 lbs. Because of the incredible strength of our dome we are able to use the shell to support the second floor. The suspension rods and plates can be purchased from A.I.
more
|
How is the second floor attached to the dome shell?
Related Questions
- The plumbing vent pipes can be routed sideways through the interior framing and can sometimes be joined ...
- Almost all of the electrical and plumbing will be contained in the interior frame walls, in the same manner ...
- Our largest standard dome (45 ft. diameter, 5/8 sphere) can be assembled by 3 people in 5 days.
- Solar Hot Water panels can be designed to set on top of the entryways or link. Anchors are buried into the ...
- The electrical and plumbing will be contained in the interior frame walls in the same manner as conventional ...