How Long Does it Take to Install ProSched?
The length of time required to install an APS system is almost totally dependent on the amount of customization performed. Installation projects involving a high degree of customization can require up to a couple of months. With an easy to use graphical user interface installation times has been shrinked drastically even when a high degree of customization is required. APS installation times are limited as to how short they can be by the determination of process restrictions to be addressed and by customizing a system for inputting the necessary data. Note that inputting the necessary data, assuming the data is available, is usually a much easier task than determining which process restrictions will be addressed.