There are factors to be considered that will affect both the time frame and the expense. These include: • Roughness of the original surface • Removal of old coatings • Availability of area to be processed • Items to work around, i.e., racking and equipment • Level of shine requested • Size of the area and number of moves • Any waste disposal costs BNE Contractors Inc. will take into account the above-mentioned variables and will provide you with a quotation after visiting your facility and an option for a test patch.
more
|
How long does the Retro Plate concrete polishing system process take to apply and how much does it cost?
Related Questions
- The Retro Plate concrete polishing system should not be used in situations where strong acids or acid vapours ...
- No drying time is needed with the Retro Plate concrete polishing system. The floor can be used immediately.
- Yes; however, new concrete should be at least 28 days old before the process takes place.
- The Retro Plate concrete polishing system can be applied to within approximately 1 to 1 ½" of perimeter ...
- From blowing the picture up, it looks like the name is Koveman. I've had a look at various retro Tomy ...