How long will the Remove and Replace (RR) or Overlay (OL or cap) of my driveway take?
If you have a typical driveway, i.e. approximately 16′ x 30′, a RR will take roughly three hours; however, these three hours will be spread over two days. The “prep” crew will come on the first day and remove the existing asphalt, apply new #304 limestone as necessary and roll the surface to the appropriate grade. You can drive on this stone surface until the paving is completed. If the weather cooperates, the paving crew will come the following day and pave the drive. An overlay will take only an hour or two and, because we will be applying a layer of asphalt to the existing surface, it will occur in one day. You should not drive on either drive for 48 hours. They should be sealed after one (1) year.