How much notice (in minutes) to the ISO-NE system operator is required to shutdown a Self-Scheduled generator that is online in the real-time market?
The Designated Entity should provide the ISO with at least 30 minutes notice to request a Commitment or De-Commitment. The ISO should reply within 20 minutes, as soon as it is reliable to do so. You can locate additional information in the section 5.3.3 located at: System Operating Procedure SOP-RTMKTS.0110.0010 Maintain Real-Time Operational Data [PDF].