How will the gypsum created by these scrubbers be removed from the power plant site?
Mirant’s preferred and primary choice for gypsum export is rail. Under a full capacity operation of the power plants that is running at maximum output approximately 70 rail cars per week will be added to our rail deliveries. This should not increase the number of rail deliveries but rather add to the length of the trains.