If I monitor a permit parameter more frequently than required by the permit, which result should be reported on the eDEP groundwater form?
The results submitted on the groundwater forms (DMR & MWDR) should be the maximum result obtained. Averages should not be submitted. For example, if two separate samples are run during the same week for a weekly BOD requirement, then the maximum result should be entered on the appropriate groundwater weekly form and the other result, inclusive of date of sampling, noted either in the comments section, sent as an attachment with the submittal or mailed in as hard copy (with a note stating such in the eDEP comments section).
Related Questions
- How will time be reported for TAs who serve as a bus monitor since the bus monitor hourly rate of pay is lower than the TA hourly rate for folks on E03 or higher?
- If I monitor a permit parameter more frequently than required by the permit, which result should be reported on the eDEP groundwater form?
- If I monitor a permit parameter more frequently than required by the permit how do I submit these results with eDEP?