Is exterior scaffolding ever required to build U-Form buildings?
A. No! Exterior scaffolding is usually never required. The only scaffolding that is required is a 6′ high scaffold set up around the interior perimeter of the working deck for the crew to pour and vibrate the concrete. U-Form easily satisfies all U.S. Dept of Occupational Safety and Health Administration (OSHA) requirements.