Is it accurate that if a TP has passed FL R3 testing, that VA will waive VA testing and simply start in Prod?
The limited connectivity test will consist of a R3 Virginia compliant test file (FROI or SROI). Communications via FTP with PGP from the source system to the State of Virginia’s specified FTP URL will be required. The file will be processed by Virginia and acknowledgments will be returned. As long as the file does not error for structural / technical reasons the trading partner will be sent the formal authorization via email to start production. Structural / Technical errors are considered things such as: Incorrect Header information or length, incorrect Trailer information or length, improper 148, A49, R21 or R22 formats, etc. Please see the implementation testing section for more information.