My roof has slope built into it for drainage; can I obtain a level foot traffic surface with Plaza Paver?
Related Questions
- I have built a 300 square foot addition to a two-story house, but I found that the total duct leakage is 20%. Do I need to tear out drywall to get to the ducts between the floors?
- My roof has slope built into it for drainage; can I obtain a level foot traffic surface with Plaza Paver?
- How wide of a gutter can Roof Drainage Components & Accessories, Inc. produce?