Q:

We recently had a plumbing repair in our street. How should the hole be prepared, prior to having it patched with asphalt?

1
Like
Answer
Comment
Flag
Thanks for your feedback!
A:

1 Answer

rank
1
1
Like
Comment
Flag
After the plumber has completed the repair and has stabilized the area surrounding the pipe, he needs to pump out any water that is in the hole, then fill the hole with G.A.B granular aggregate base material, in 12 inch lifts, compacting each lift, until the hole is filled, with approximately 2-3 inches of rock remaining above street level. After approx. 5-7 days, the area can be patched, by removing the excess rock down to a depth of 3 inches, compacting the remaining rock, then patching the area with hot mix. Never let the plumber place the excavated dirt and material back into the hole after completing the plumbing repair, especially if the material is wet. Always use the method outlined above.  more
asphaltenterprises.com

Related Videos

Add your answer...

Top Answerers

1.
Cheap SSL Certificates
7 Answers in the past week
2.
vanity fair
7 Answers in the past week
3.
Robert Turner
4 Answers in the past week

Top Askers

1.
Frank Bell
2 Questions in the past week
2.
Frank Bigaglow
3 Questions in the past week
3.
Charles McAtee
2 Questions in the past week

Top Supporters

1.
Tom Wagner
9 Likes given in the past week
2.
Susan Brunner
3 Likes given in the past week
3.
CableAnd OtherThings Too
2 Likes given in the past week
...