What are the construction costs for the different types of trail surfaces, bridges, tunnels and amenities?
A The preliminary design report will include construction and maintenance costs for different types of trail surfaces as well as the life cycle of each so the Committee can make informed design decisions based on short and long term costs. The preliminary design report will also provide costs for the construction of the bridges and tunnel.