What are the telemetry requirements for a separated virtual resource providing Balancing Energy Service Capable Non-Spin Reserve Service (BESCNSRS)?
Telemetry requirements for separated virtual Resource providing BESCNSRS is in accordance with Section 10.3.2.1, Generation Metering Splitting. The QSE will provide ERCOT with a Real-Time signal of the MW of generation per virtual generator unit. Telemetry requirement for the physical unit remains unchanged (MW, MVAR, etc.).