What are the typical infrastructure requirements, deployment procedures for executing this migration?
Though the actual steps and requirements would vary depending upon the existing infrastructure in your data center, a typical migration project would have the following requirements: BVBridge is deployed as part of the application war file. It does not have any special infrastructure requirements. Of course, configuration steps need to be followed which will be a part of the deployment process. • With BV8.x there is no concept of IM’s. Installations that utilize multiple IM’s will be deployed as separate applications. Load balancing if required would be handled through application clustering typical of any J2EE deployment. • A development environment will be needed for initial testing. • A fresh installation of BV8.x will be done on the development application server. This deployment will include the BVBridge jar. • Existing application source code will be copied onto this server after which BV migration scripts will be executed. This would be for the non-JavaScript code base. The Java