What changes to the RFP are contemplated for the system descriptions in Section L, Tab 2 through Tab 3.1?
The following paragraph in Sec. L Tab 2 will be deleted from the next amendment: “Describe the type, guaranteed minimum core counts, memory configurations and purpose of the processors to be delivered at each update of the HPCS configuration. Prior to the delivery of the initial or any subsequent installations or upgrades, the Government reserves the right to negotiate the configuration that will be actually installed.” The Government will clarify Sec. L Tab 3 by adding the following language: ” For the initial delivery, the Government expects this description to closely parallel the delivered system. For the upgrade, the Government requires a similar, but less detailed description.” (The “description” referenced above refers to the system description for the base period) Sec. L Tab 3.1 will be modified to add the following: “For each upgrade, identify the sources of the expected increase in performance. For each upgrade, show how the proposed performance level was calculated. Provide