What company designs and fabricates the main component, the calciner at the thermal-recycling plant?
Air Preheater Co. formerly a division of ABB designs, fabricates and guarantees the calciner will run 7,884 hours, 365 days per year (90% overall). In case of mechanical failure, Air Preheater Co. will prorate the cost and reimburse the county for any lost income from byproduct(s) that were already pre-sold.