What comprises a complete submission package to MCDOT?
A complete submission package to MCDOT consists of the following items, which are also listed on the M-NCPPC Preliminary Plan application: a. Three (3) copies of the preliminary plan. b. Storm Drain Capacity and Impact Study (Note: this is not the Stormwater Management Concept) in accordance with MCDOT storm drain criteria and errata. c. Sight Distance Evaluation Certification on County form. d. Traffic Study or Traffic Operation Statement (includes LATR/PAMR, circulation, queueing…). e. Tentative Street Profiles f. Measures needed to remedy deficiency (concept plan, order of magnitude, cost estimate of potential solutions). g. Design waiver package if applicable. • What is a storm drain study? — Top A storm drain study consists of the following items: a. Watershed name and classification. b. Verification of 100 year floodplain limits. c. Pre and post developed drainage divides. d. Pre and post development flows. e. The capacity of the existing downstream public storm drain system,