What did the SPRA find that drove the DSAC II rating?
The SPRA identified concerns about possible increased seepage at the toe of the dam, an undetermined flow rate at the river spring a quarter mile downstream, and potential flow channels through karst limestone below the spillway during pool events above 1600 feet. Additionally, the team considered the probability of failure and potential failure consequences.