Important Notice: Our web hosting provider recently started charging us for additional visits, which was unexpected. In response, we're seeking donations. Depending on the situation, we may explore different monetization options for our Community and Expert Contributors. It's crucial to provide more returns for their expertise and offer more Expert Validated Answers or AI Validated Answers. Learn more about our hosting issue here.

What is a good procedure to load minor bases on an ABI 392/394 synthesizer with a minimum loss of amidite inthe priming step?

0
Posted

What is a good procedure to load minor bases on an ABI 392/394 synthesizer with a minimum loss of amidite inthe priming step?

0

RESPONSE:When minor base amidites are loaded on an ABI synthesizer using the bottle change procedure ~ 400 l of amidite solution are consumed in the prime step. To minimize this loss a manual procedure can be used to load minor bases with a minimal loss of amidite (~ 200 l). This procedure can be used in the manual control mode on the ABI synthesizer using timed delivery of the reagents to change minor bases. 1. Transfer ~ 3.0 ml anhydrous ACN to a clean amidite bottle. 2. Remove old amidite bottle from the “5” position. Wipe line and replace with amidite bottle containing ACN. 3. Rinse bottle 5 line with ACN and Argon.

Related Questions

What is your question?

*Sadly, we had to bring back ads too. Hopefully more targeted.