What is the anticipated timeline and cost for completing the Master Water Control Manuals?

0
Posted

What is the anticipated timeline and cost for completing the Master Water Control Manuals?

0

A.11. The timeline to complete the Master Water Control Manual is approximately two years from this point and $5 million.