What is the capacity of the AGTS and what options are being explored for increasing capacity?
The AGTS is currently operating near capacity given the existing system configuration and controls. DIA is planning for an extension of the AGTS track to accommodate an additional train on the system while meeting current headways, travel times, and levels of service to AGTS users. These improvements will increase system capacity and allow the AGTS to accommodate activity growth through 2015/2020, including concourse expansion. The Master Plan Study is exploring options for expansion of the AGTS to support future terminal improvements and growth. Because the AGTS system is an integral part of the terminal, options and solutions must be developed in parallel with the terminal concepts. Given that the AGTS at DIA is a must-ride system, the Master Plan Study is exploring options for enhancing the operational redundancy and contingency aspects of the system to ensure that the Airport can remain open and operational in the event of an unexpected outage of the AGTS.