What is the dry time for Coat-It?

coat-it dry time
0
Posted

What is the dry time for Coat-It?

0

Mixed Coat-It should be applied within 30 minutes. Adequate dry time is approximately 10-12 hours @ 70°F (21°C) (less than half the time of competitive brands). Cure time decreases with higher temperatures and increases with lower temperatures. Thick coats cure faster than thin coats.