What is the sampling regimes before and after ice pigging operation?
A This will depend upon the client’s regime. The normal parameters to measure pre and post ice pigging would be Iron, Manganese, Turbidity, PAH and Benzo. During the ice pigging operation temperature, pressure, conductivity, flow rate are also recorded. Following the operation you will be provided with the total volume of material removed.