• If a project is submitted by a Professional Engineer or Architect then the following documentation, as a minimum, must be signed and stamped by the Professional Engineer or Architect: • Calculations and Design Data – As required by the Swimming Pools Program or by the Arizona State Board of Technical Registration’s rules and regulations. • Design Drawings – Each Individual Design Drawing Sheet. • Technical Specifications – Cover, Table of Contents or First Page. • Reports and Other Documentation – As required by the Swimming Pools Program or by the Arizona State Board of Technical Registration’s rules and regulations. The engineering or architectural firm must also be registered with the Arizona State Board of Technical Registration. It is recommended that engineers and architects submitting documentation to the Swimming Pools Program contact the Arizona State Board of Technical Registration if they have any questions about the rules and regulations related to sealing documentation.
more
|
What types of documentation must be sealed by a Professional Engineer or Architect?
Related Questions
- Depending on the scope of work and/or the associated construction cost, plans may have to be stamped and ...
- A. Generally, for commercial and multi-family construction, all plans must be signed and sealed. For detached ...
- The construction drawings will not be sealed by an architect or engineer. In some instances building ...
- Generally, for commercial and multi-family construction, all plans must be signed and sealed. For detached ...
- Plans must be signed and sealed by a Florida registered architect or engineer, or they must comply with a ...