What will be the Costs of the Individual Stages, such as Internal Cladding, Roofing, Etc.?
Roofing and Internal Cladding are two separate stages on Geodesic Domes, which are more labour intensive than on conventional homes. They are not more complicated; they just take longer to complete. You are going to get a higher quote for your Internal Cladding per sqm on the dome than you do on conventional houses, but remember there is less surface area to cover than if you were covering the exact same square are in a conventional house. The easy part of the Internal Cladding is the dome shell. There are only three sizes of triangles, and a competent tradesman can do a great part of his cutting at one time, thus saving time and money. An experienced tradesman should install internal Cladding. By no means should either the owner/builder or someone in the industry be cowed by thinking that Internal Cladding is difficult. Again, it is not more difficult – it will simply take longer to do. Applying the roofing is basically the same answer – you will have to pay a higher price per sqm to
Related Questions
- Is the Internal Rate of Return calculated on an individual energy conservation measure basis, or on a total project basis?
- What happens if construction costs are higher than those estimated, which would lead to a lower Internal Rate of Return?
- What are the costs to convert a Profit Sharing Plan to a Principal Trust Individual 401(k)?