What will happen if the approved agency forgets to notify the County prior to performing the footing inspection?
The approved inspection agency will be disqualified. Henrico County will no longer accept footing Henrico County will conduct a site visit to evaluate the existing site conditions against the footing inspection report and the approved permit application. Borings shall be made adjacent to specified locations along the footing to confirm footing depth and soil conditions as noted on the report. Any identified discrepancies will result in rejection of the footing. 8. Builders frequently call in the late afternoon to schedule a footing inspection to be made after 4:30 p.m. What notification does the County require for late afternoon or early evening footing inspections that are requested on the same day? Answer: The approved agency must request an inspection on the ABC’s system prior to performing the inspection, and indicate the scheduled time of the inspection. The call-in time is recorded by ABC’s and is printed on the inspection ticket. The building inspector will audit these inspectio
The approved inspection agency may be disqualified. Henrico County will not accept footing inspection reports from disqualified registered design professionals. Henrico County will conduct a site visit to evaluate the existing site conditions against the footing inspection report and the approved permit application. Borings shall be made adjacent to specified locations along the footing to confirm footing depth and soil conditions as noted on the report. Any identified discrepancies will result in rejection of the footing. 8. Builders frequently call in the late afternoon to schedule a footing inspection to be made after 4:30 p.m. What notification does the County require for late afternoon or early evening footing inspections that are requested on the same day? Answer: The approved agency must request an inspection via http://www.co.henrico.va.us/bldg/insp/ prior to performing the inspection, and indicate the scheduled time of the inspection. The building inspector will audit these in
Related Questions
- Can the Henrico County inspector reject the footing or the footing inspection report that has been issued by an approved agency?
- Why must the approved inspection agency notify Henrico County prior to performing a residential footing inspection?
- What will happen if the approved agency forgets to notify the County prior to performing the footing inspection?