When was the surveying and basemapping conducted?
Field surveys began in spring 2007 to provide aerial photogrammetry ground control. Additional field surveys were conducted to supplement aerial photogrammetry, obtain detailed utility information, and establish street right-of-way limits. Basemapping for the streetscape design was performed concurrently with the field surveys.