Why do the construction schedules for Bijou, Colorado and Cimarron bridges overlap?
The work at all three bridges is extremely complex and will take several months at each location. Construction at Bijou Street and the I-25 bridges over Colorado Avenue was already scheduled for 2007 in order to meet contractual completion dates. City engineers knew the Cimarron Street bridge needed to be replaced immediately, when deterioration of the existing bridge at Cimarron Street was discovered in summer 2006. Costly repairs would have only temporarily fixed the problem before the bridge’s scheduled replacement in 2009.