Why is the new pipeline necessary?
Our existing 16-inch crude pipeline to the Detroit refinery is not large enough to handle the increased volumes of heavy crude oils. The system will be upgraded to handle the new crude oil by installing approximately 29 miles of new 24-inch diameter line, which will parallel much of the existing pipeline right of way in portions of Monroe and Wayne counties.