Why is the Pressurized Irrigation Project only paving the work trenches and not the entire road?

0
Posted

Why is the Pressurized Irrigation Project only paving the work trenches and not the entire road?

0

A. In association with the pressurized irrigaiton project, contractors are required to repave the trenches where the pipe and service lines have been installed. This work is warranted for a year after installation and contractors are required to return and repair the work if it settles or comes apart. There was not enough money in the bonds to repave every road in American Fork at the time of the PI project. The city did choose to re-surface roads which were in greatest need.

Related Questions