...

Filter by tags

Selected Tags


Questions, Articles and Polls

1 Like · 1 Answer
A:
One cause for this is that you might be running the VM without specifying some required options. • Make sure that you are running the correct version of VM (Refer to Software Requirements in help documentation). • Make sure that the options Xdebug ... more
2 Likes · 1 Answer
A:
Gait laboratory investigations give scientific backing and explanation of the redundancy being used subsequent to injury, as compensation for neuromuscular inefficiency. We believe that greater understanding of a walking pattern can therefore ... more
2 Likes · 1 Answer
A:
Any process loop identified as a safety system is referred to as a Safety Instrumented System (SIS). In the past, these loops were defined as Emergency Shutdown (ESD) or Safety Shutdown (SSD). The purpose of an SIS is to reduce the risk of an ... more
AMS SH · over a year ago · 0 Likes · 0 Answers
Q:
Are IEC 61508/61511 enough to implement e.g. an emergency shutdown system for a facility? In other words, Do they cover practical installation considerations and best practices e.g. sensors and actuator installation guidelines? ... more
2 Likes · 1 Answer
A:
The Etch Call Graph Profiler transforms every DLL used by the program, say "foo.dll", into either "foo-patch.dll" or "foo-etch.dll". The "-patch" DLL is created when the Etch determines or the user specifies that foo.dll is not to be instrumented. ... more
1 Like · 1 Answer
A:
If you see some failures messages in the instrument.warning, but don't see any failure messages in cginstrument.log, there is usually nothing to worry about. Failure messages in instrument.warning can occur when Etch has problems instrumenting a ... more
2 Likes · 1 Answer
A:
Yes. The E8000 server board has been designed with extensive server management firmware. This firmware consists of the Baseboard Management Controller (BMC), a microcontroller responsible for all server management, monitoring and control functions. ... more
2 Likes · 1 Answer
A:
The instrumented treadmill eliminates the frustrating necessity of repetition of tests to get clean foot strikes. The use of the treadmill also allows for statistical analysis of the gait cycle because large numbers of strides can be captured in a ... more
2 Likes · 1 Answer
A:
The Bertec Corporation instrumented treadmill is actually two treadmills mounted side-by-side creating one split-belt treadmill. Each tread has its own 6-component force plate inside. By maintaining the belt system as a closed loop system, we are ... more
2 Likes · 1 Answer
A:
The FWD applies an impulse to the road surface by a specially designed loading system which represents the dynamic short term loading of a heavy wheel load. For example, the Dynatest FWD produces an impact load of 25-30 ms duration, and a peak force ... more
1
...