Is the wall color, texture, etc. the same that was approved?
Usually, the contractor can make a determination about whether the vertical wall was built according to the design which was approved in the permit. The applicant can be required to provide a copy of the approved project description with the bid documents, and to obtain from the contractor a statement which either verifies that the final project conforms with the approved project or identifies all ways in which the final project differs from that which was approved. Project changes could be noted on a copy of the project plans or through new as-built plans. If the analyst wants to check this information independently, the exposed dimensions can be measured with a tape measure and color and texture can be determined through visual examination. Condition of the vertical wall Is there any exposed reinforcing bar or rust stains on the concrete facing? Is there any visible damage to wood members? Is there any spalling (chipping or fragmenting) of the concrete, and if so, how extensive? Has