Do permeable piers fall under Category I, Regional Permit 11 (Marine Structures and Activities)?
A27. Yes, provided the District determines that there are no impacts to navigation and/or the littoral drift system. [Top of Page] Q28. Will the length of a stream bank stabilization project under Regional Permit 10 (Bank Stabilization) be based on the stream channel length or based on the shoreline length along one side of the stream? A28. The length of a stream bank stabilization project is based on the shoreline length along on one side of a channel. For a proposed project with structural bank stabilization, the maximum length allowed under the RP 10 is 500 feet.
A26. Yes, provided the District determines that there are no impacts to navigation and/or the littoral drift system. [Top of Page] Q27. Will the length of a stream bank stabilization project under Regional Permit 10 (Bank Stabilization) be based on the stream channel length or based on the shoreline length along one side of the stream? A27. The length of a stream bank stabilization project is based on the shoreline length along on one side of a channel. For a proposed project with structural bank stabilization, the maximum length allowed under the RP 10 is 500 feet.
Related Questions
- Does maintenance of quarry stone breakwaters and revetments fall under Category I, provided a permit has been issued in the past?
- Do permeable piers fall under Category I, Regional Permit 11 (Marine Structures and Activities)?
- What types of activities fall under the category of "manage and update account information"?