How do I output horizontal distances in the stakeout routine?
SA 2.2 will always use the Vertical Distance system for stakeout. The following instructions pertain to SA 2.05 and earlier versions. From the Field Work Setup menu, select Units/sys, then select “Vertical Distance” for the Veritcal System field. Then go into the stakeout routine. Q16 What Total Stations are compatible with SA? Geotronics 400’s Geodolite Geotronics 140 Kern E1, E2, 500 (discontinued) Lietz SET2,3,4, SET500 Sokkia Set 5 Nikon TOP GUN SNG Nikon TOP GUN SNG TRK Nikon TOP GUN RPT TRK Nikon TOP GUN SNG TRK METRIC Nikon TOP GUN RPT TRK METRIC Nikon DTM-5 Nikon DTM-512 (See Note 1 below.) Pentax 10/II/III Pentax PTS-5/10/V3/515 Pentax PCS Series Topcon GTS-3&4 FINE Topcon GTS-3&4 COARSE Topcon ET2 Topcon GTS-300/600/800 Sereis (See Note 2 below) Topcon GPT-1000 (See Note 2 below) Topcon APL1A (in non-robotic mode) Wild T1000 Wild TC1000-3000 Wild T/TC 1010-1610, TC-500 Leica TCA1103 (in RS-232 mode, not PCMCIA mode) Leica TCR303 (in RS-232 mode, not PCMCIA mode) Leica TC1800