How do I update ready mix plants to utilize ACTS?
• Blower from tanker can be relocated, or a new blower can be installed at ready mix plant. • Industrial radar level sensors are installed on each silo. • Silo control panel is installed at ready mix plant. Panel includes an industrial grade retractable cable to allow quick connection from silo control panel to tanker control panel. • Industrial grade compressed air line is installed to allow quick connection from ready mix compressor to tanker. • Optional Internet, Ethernet and/or cell phone notification system can be added at any time. What happens if a line blockage occurs? With traditional tanker unloading a driver must manually monitor the process. When a blockage or bridge occurs, he performs a series of valve adjustments to correct the problem. With ACTS monitoring of pressures and adjustment procedures are automatic. The potential for human error and oversight are eliminated. How do I make deliveries to ready mix plants that have not been automated? All tanker control panels pr